Photographic survey and watching brief by K Bower of PCA on a section of the Railway Straight prior to overlay resurfacing revealed details of the track construction and repair to the Scheduled racetrack. Year 2013-14 ID 2251 NGR TQ065627 Periods 20th century Borough Elmbridge Organisation Pre-Construct Archaeology