Watching brief by P Guarino of AOC during the excavation of a trench close to the Scheduled racetrack revealed a layer of sand used to make up the level of the ground for the track and evidence of extensive modern truncation. Year 2007 ID 1 NGR TQ060618 Periods 20th century Borough Elmbridge Organisation AOC (Archaeology) Group